Home > About us > Case Studies > 2020 PRIME POWER FOR DRILLING PLATFORM CONSTRUCTION, CHINA
2020 PRIME POWER FOR DRILLING PLATFORM CONSTRUCTION, CHINA
Press releases2020/07/14

On July 7, 2020, Fujian Putian Pinghai Bay offshore wind power area F project undertaken by Jiangsu Longyuan Zhenhua Marine Engineering co., LTD of Shanghai Zhenhua Port Machinery Company Limited. successfully completed the drilling construction of the first type III rock socketed single pile with a diameter of 7 meters. The project is located in Pinghai Bay, Fujian. The drilling depth of the first pile F4 is 27.5 meters, and the diameter of the borehole is 7 meters. The rock socketed depth of weakly weathered hard rock is about 19 meters. The maximum saturated compressive strength of hard rock is 120MPa, and the total cumulative drilling time is 16 days.


For the first time, the new drilling rig HSFDD110 independently developed by Shanghai Zhenhua Port Machinery Company Limited. was adopted in the project. In view of the higher requirements of the construction party's equipment for power supply equipment, the adverse weather, moist, salt fog and other environment, BAIFA technical team made careful research and finally provided two customized BF-C1375W container type diesel generator sets, equipped with Cummins engine, and successfully completed the gensets check before acceptance. In the construction site, the steady performance of BAIFA gensets had been praised by the construction party.


The perfect "debut " of the new drilling rig cannot be achieved without the full support of BAIFA gensets. This project fully demonstrates the excellent and rich project experience of BAIFA in the field of diesel generator sets.



contact form
  • Name
  • Company
  • Country
  • Email
  • Message